Breedon Aggregates Ltd Contact Us
Breedon Aggregates Ltd

Ready-mixed concrete for Foundations

1stMix offers the best quality ready-mixed concrete solutions for your foundations. Using specialist mini mix vehicles, we will provide you with a highly cost-effective means of placing small volumes of ready-mixed concrete. Ideal for home building, extension and renovation work, or where site access is difficult.


This is a versatile, economical and durable mix designed specifically for use in foundations and groundworks.

Applications

  • House foundations
  • Garage foundations
  • Conservatory foundations
  • Outbuilding foundations
  • Wall foundations

3 easy steps to get your FREE ready-mixed concrete for foundations quote

  1. Calculate the quantity you require
  2. Select your concrete type by application
  3. Provide your details in the form or call us on 0845 413 5208


How much ready-mixed concrete do I need?
If you are unsure how much concrete you require for your project, use our ready-mixed concrete calculator on the right of this page. Simply enter the dimensions of the area(s) you need for your foundations. If you have a more complex shape, divide it into rectangles and calculate the volume individually.  Then send us your requirements using the Quick Quote Enquiry Form by following this link.

1st Mix FAQs - Ready-mixed concrete for Foundations

Q. Does 1stMix concrete meet NHBC and Local Authority standards?
A. Our ready-mixed concrete has been designed to meet all relevant Building Regulation requirements.
   
Q. Is 1stMix concrete easy to place in a strip foundation?
A. Yes, our ready-mixed concrete is quality-assured and has been specifically designed to be easily and quickly placed in a strip foundation. 
   
Q. Will 1stMix concrete be resistant to chemicals in the ground?
A. Our ready-mixed concrete has been designed to meet NHBC and British Standard requirements for low-rise buildings. If you require, the ready-mixed concrete can be modified to cater for more aggressive ground conditions. If this is something you need please let us know when placing the order or requesting a quotation.
   
Q. How long after placing the concrete can the bricklayer start work?
A. Normally, the following day, but the concreted foundation must be protected in cold weather conditions.
   
Q. Is there a high workability alternative?
A. Yes, a flowing, self-levelling version of our ready-mixed concrete is available which enables the whole foundation to be poured from one poured from one or two points and will require minimal effort to obtain a compacted and level finish. If this is something you need please let us know when placing the order.
Concrete Quick Quote
Calculate the quantity
  m2



 
Select your concrete type by application
Enter your details